John Wood54 Alexandra Road, Rayleigh, Essex, England. SS6 8HS.
Johnwood704@yahoo.co.uk
Tel: +82 19 310 6811
Citizenship: United Kingdom
Date of Birth: 16th may, 1970
Summary
, 7 years supervisory experience in overseas infrastructure projects
, Excellent knowledge of cable stay installation and tensioning
, Extensive computer background using Windows based software
, Experienced in dealing with multicultural labour force
, First aid and site safety courses attended
Professional Experience
, Great Man-Made River Project Libya 2000-2001
Advitam Group
Installed and maintained acoustic monitoring systems used to locate wire breaks in prestressed concrete pipelines. Analyzed acoustic data to identify wire breaks and prepared reports for client. Responsible for the implimentation of current Quality Assurance standards and procedures during the installation process.
, Pure Technologies Canada 2000
Received one month of training for the Libya project consisting of the preperation, testing and shipping of equipment and materials. Training included testing and troubleshooting to ensure compliance with ISO 9001 standards.
, Seo Hae Grand Bridge South Korea 1999-2000
, Oresund Bridge Sweden 1998-1999
, Ting Kau Bridge Hong Kong 1996-1997
Freyssinet International
Responsible for all aspects of stay-cable installations, to include cables up to 400 metres in length, currently the longest to date. Stay-cable retensioning and finishing works using state-of-the-art computer controlled hydraulic equipment. Experienced in rigging, lifting and installation of equipment at high elevations. Experienced in heavy lift operations up to 1400 tonnes. Maintained QA documentation in accordance with contractual guidelines.
, Chek Lap Kok Airport Hong Kong 1994-1996
AWJV (Paul Y, McAlpine and Downer)
Installed storm water drainage systems, potable water and fire hydrant systems. Prepared work instructions for the survey department after checking for conflicting informational using pertinent drawings. Maintained an extensive QA documentation and conducted surveys of completed pipelines.
Education
, A-Level certificates in Physics and Mathematics
Objectives
To obtain a position that will allow me to build on my experience and utilized my full capabilities for the betterment of the company. It is also my intention to start a civil engineering degree program that will assist in reaching these goals.